易发彩票

联系我们

联系我们

地址:山东省济南市槐荫区经十路28922号乐梦公寓3号楼1701

电话:0531-59825626

手机:18769786220

手机:13355353311

联系人:位经理

网址:

无机纤维喷涂施工方法流程,你了解吗?
来源:/ 日期:2018-08-15 发布人:admin

对于刚接触这类吸音工程的朋友来说可能不太了解,接下来通过我对无机纤维喷涂施工的了解,来给大家讲解一下非专业人员无机纤维喷涂施工的过程好后期处理保护。

For those who have just come into contact with this kind of sound absorption project may not know much, then through my understanding of inorganic fiber spraying construction, to explain to you the process of non-professional inorganic fiber spraying construction good post-treatment protection.

首先施工是需要看现场需要,对于房顶过高的场地需要搭脚手架,如果场地允许,无障碍移动用机动升降机可以节省施工时间,其次就是对电压的要求,需要4线400伏电压才能稳定机器的运行。再加上干净的自来水就可开始施工了。

First of all, the construction needs to see the site needs, for the roof is too high site needs to build scaffolding, if the site allows, barrier-free use of motor lifts can save construction time, followed by the voltage requirements, need 4 lines of 400 Volts voltage to stabilize the operation of the machine. With clean tap water, we can start construction.

下面就是无机纤维喷涂施工方法和细节

The following is the construction method and details of inorganic fiber spraying.

1)由于是喷射型施工方法,所以在能喷到的地方且不需要喷的地方用油纸包住。

1) Because it is a spray-type construction method, it is wrapped in oil paper where it can be sprayed and does not need to be sprayed.

2)杂物清除:清除基础表面上不需要的钉子、螺栓类、钢筋等。清除水性涂料等耐水性差的表面材料。

2) debris removal: remove nails, bolts, reinforcing bars, etc. that are not needed on the base surface. Remove water resistant coatings and other water-resistant surface materials.

3)原则上在管道、配管、配线等线路的吊具以及配管开孔作业、开口周边的木架都施工完成之后,附带设备工程开始安装之前进行施工。而且,开口部周边的遮盖作业务必提前完成。

3) In principle, after the completion of the construction of hangers for pipelines, piping, wiring and other lines, as well as the operation of piping openings and the wooden frame around the openings, the construction of ancillary equipment works will begin before installation. Moreover, the business of covering the opening of the opening must be completed ahead of schedule.

A级防火保温材料

无机纤维喷涂施工准备

Preparation of inorganic fiber spraying construction

1)与图纸核对校验,确定无机纤维喷涂施工的部位和非喷涂部位

1) check with the drawing to determine the location and non spraying part of the inorganic fiber spraying.

2)安置喷涂机械、调验喷涂主机,保持运转稳定均匀

2) resettlement spraying machine, testing and testing the spray mainframe, keeping the operation stable and uniform.

3)调验喷涂胶泵,保持压力稳定均匀,联合调试主机和液泵系统,并进行局部试喷。

3) Adjust the spraying glue pump, keep the pressure stable and even, jointly debug the main engine and the liquid pump system, and carry out local test spraying.

无机纤维喷涂施工的工艺流程,简单说来就是基底预喷——喷涂施工——整形——清理。

The technological process of inorganic fiber spraying construction is simply the base pre-spraying - spraying construction - shaping - cleaning.

1)基底预喷:基础表面涂刷粘合剂或者喷涂其(胶液)水溶液,在充分渗透到基础后再进行喷涂作业

1) Substrate pre-spraying: base surface brushing adhesive or spraying its (glue) aqueous solution, fully penetrated into the foundation after the spraying operation

2)无机纤维喷涂施工:按要求一次喷涂到预定厚度。

2) inorganic fiber spraying construction: spraying the required thickness to the required thickness.

3)无机纤维喷涂施工后的整形:利用专用压板进行表面加工(整形)后的表面,用加入粘合剂的胶液混合液全面喷涂。

3) Inorganic fiber spraying after the shaping: the use of special pressure plate for surface processing (shaping) after the surface, with the addition of adhesive liquid mixture spraying.

4)清理:现场回弹料清理;防护遮挡材料拆除;作业面成品擦拭清理。

4) cleaning: on-site cleaning of springback materials; removal of protective shielding materials; cleaning of finished products on working surfaces.

以上就是关于无机纤维喷涂施工方法流程的介绍,想要了解更多内容,可以关注我们的网站,在网站中有更多精彩内容的介绍,希望能为你提供帮助!

Above is about the inorganic fiber spraying construction method flow introduction, want to know more content, you can pay attention to our website, there are more wonderful content in the website, hope to help you!


上一篇:对A级防火保温板的认识误区有哪些?
下一篇:A级防火保温板,你了解吗?

 
在线咨询
全国咨询热线
18769786220
友情链接:凤凰彩票官网  新利彩票官网  万豪彩票平台  万豪彩票  旺旺彩票  名门彩票  万豪彩票  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!